首页> 外文会议>Coiled Tubing Well Intervention Conference >Fishing Coiled Tubing With Internal Weld Seams and Failed BPVs in a Live Well Environment Using Hydraulic Workover (HWO)
【24h】

Fishing Coiled Tubing With Internal Weld Seams and Failed BPVs in a Live Well Environment Using Hydraulic Workover (HWO)

机译:使用液压工作台(HWO)钓具带内焊缝的卷绕管,并在直播环境中失败的BPV。

获取原文

摘要

This paper examines techniques necessary to fish coiled tubing (CT) with internal weld seams in a live well environment without back pressure valves (BPVs) using a hydraulic workover unit (HWO). The challenges of placing barriers in internal seamed CT verses using the slip and shear method is addressed. The discussed onshore operation was completed August 2013 in North America. Using the techniques described, a 14,000-ft (4267 m) 2-in. (50.8-mm) CT fish was successfully removed from a well with an average surface pressure of 5,500 psi. This was achieved by first opening the blind rams, snubbing in, and dressing off the CT fish. Next, the CT fish was latched with an overshot and a pull test was performed, pressure was equalized, and the slip and pipe rams were opened. Following, the CT fish was picked up and moved to a desired location in the blowout preventer (BOP) stack (approximately 51 ft 4 in.). The slip rams were then closed and a weight check was performed. The pipe rams and inverted rams were then closed. The CT fish was shear/cut, the pipe was picked up and the blind rams were closed. This was concluded by laying down the fish and the process was repeated 276 times with an average cut of 50 ft. The HWO fishing procedures consisted of 541 hours without any health, safety, or environment (HSE) incidents, accidents, injuries, or job failures.
机译:本文研究了使用液压器械单元(HWO)的活井环境中带内焊缝的内部焊缝在带内焊缝中捕获卷绕管道(CT)所需的技术。解决了使用滑动和剪切方法在内部接缝CT型术中放置屏障的挑战。讨论的陆上运营于2013年8月在北美完成。使用所描述的技术,14,000英尺(4267米)2-In。 (50.8毫米)CT鱼从井中取出,平均表面压力为5,500 psi。这是通过首先开启盲栏,慢入并梳洗CT鱼来实现。接下来,CT鱼用过时锁定,并进行拉动试验,均衡压力,并打开滑动和管柱。遵循,CT鱼被拾取并移动到井喷预防液(BOP)堆叠中的所需位置(约51英尺4英寸)。然后关闭滑辋并进行重量检查。然后关闭管柱和倒置柱塞。 CT鱼被剪切/切割,拾取管道并关闭盲柱。这是通过铺设鱼的结论,该过程重复了276次,平均降低了50英尺。香港油河渔业程序包括541小时,没有任何健康,安全或环境(HSE)事件,事故,伤害或工作失败。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号