Surpassing the Challenges of CT Interventions in a Trilateral Extended Reach Well in the Arabian Gulf

机译:在阿拉伯海湾的三边延伸范围内超越CT干预措施的挑战

获取原文

摘要

The oil industry in the UAE is striving to advance both onshore and offshore operations to address technological challenges that will allow for increased oil production in a safe and efficient manner. Offshore, artificial islands are being built for the purpose of accommodating up to 300 wellheads on a single island, with the wells themselves comprising multiple, extended-reach horizontal laterals. These ground breaking projects present new and exciting challenges for coiled tubing (CT) interventions, which require extensive planning and the use of innovative technologies. Specific challenges were identified during the design phase of intervening on a trilateral, extended reach well and applying several technologies enabled us to overcome these challenges to allow successful execution of a stimulation treatment on the well. Techniques used included accessibility modelling and CT string selection to achieve maximum reach. The methodology used and the testing conducted were designed to ensure that the multicomponent CT bottomhole assembly (BHA) allowed for selective engagement of each lateral and subsequent horizontal accessibility of each extended-reach lateral. Operations were performed in the context of the completion restrictions, diameter of the openhole and cased-hole laterals, and the requirement to pump large volume acid treatments. Each of these factors added a layer of complexity to the final CT BHA selection and setup, which had to operate within a limited range of activation pressures and rates. Finally, the lessons learned during the execution phase have been captured and recommendations formulated for moving forward with CT intervention in similar types of multilateral and extended reach wells. These lessons contribute to subsequent studies of maximum reservoir contact wells and form the basis of future development and intervention plans for the offshore and islands projects in the UAE.
机译:阿联酋石油工业致力于推进陆上和海上业务,以解决技术挑战,以便以安全有效地提高石油产量。海上,人工岛屿正在建造,目的是在一个岛上容纳多达300个井口,井本身包括多个延伸的水平侧面。这些地面破坏项目为卷绕管(CT)干预造成了新的和激动人心的挑战,这需要广泛的规划和使用创新技术。在介入三边的设计阶段确定了特定的挑战,扩展了良好,并申请了一些技术使我们能够克服这些挑战,以便在井上成功执行刺激治疗。使用的技术包括可访问性建模和CT字符串选择以实现最大达到。所使用的方法和进行的测试被设计为确保多组分CT基底孔组件(BHA)允许每个横向和随后的每个延伸到横向的水平可访问性选择性地接合。在完成限制的背景下进行操作,露出孔径和壳孔横向的直径,以及泵送大体积酸处理的要求。这些因素中的每一个都在最终CT BHA选择和设置中增加了一层复杂性,并且必须在有限的激活压力和速率范围内运行。最后,已经捕获了在执行阶段学到的经验教训,并制定了在类似类型的多边和延伸到井中的CT干预前进的建议。这些课程有助于对最大水库接触井的后续研究,并为阿联酋海外和岛屿项目的未来发展和干预计划构成未来的发展和干预计划的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号