首页> 外文会议>Coiled Tubing Well Intervention Conference >Light Well Intervention Using Conventional Slickline and Electric Line off the East Coast of Canada
【24h】

Light Well Intervention Using Conventional Slickline and Electric Line off the East Coast of Canada

机译:使用传统的光滑和电气线路从加拿大东海岸的常规光线和电气线路进行光线干预

获取原文

摘要

Well intervention is a critical aspect of managing brownfield assets as operators seek to optimize hydrocarbon recovery and perform maintenance work to ensure wellbore integrity. The costs of traditional workover methods and technologies, specifically in an offshore environment, can create economic barriers to the number and types of interventions that are completed in a declining field. Light well intervention technology is considered a cost effective alternative to performing rig interventions on aging subsea wells. Operators and service providers continually seek to develop technologies and procedures that mitigate economic risk when working on these mature production wellbores. One revolution that has been in development for the past few decades involves using conventional slickline and electric line to perform light well interventions without the requirement of an offshore drilling or workover rig. This process uses a light well intervention vessel (LWIV) complete with a moonpool located mid-deck for open-sea access, a riserless pressure control package typically involving remotely operated vehicles (ROVs), and a combination of conventional slickline and electric line intervention packages. Interventions using this technology adaptation were primarily developed for the North Sea and Gulf of Mexico regions and have been widely used in those regions. However, after several years of planning, the technology has now been used for the first time to rework several wells for an operator off the east coast of Canada. Light, riserless, well intervention technologies have been deployed in three individual wellbores offshore Canada. Multiple services were required in each of these three wellbores. Conventional slickline operations were run to prepare each of wellbores, with the retrieval of crown plugs and conventional drift runs. Operations then switched to electric line services to perform diagnostic runs followed by remedial intervention services. Once the electric line services were completed, slickline services were used for safety valve isolations and gas lift remedial work and then returning the newly configured wells back to production mode. The use of the LWIV provided the operator with an efficient intervention technique to evaluate and potentially improve well performance.
机译:井干预是管理棕色地区资产的关键方面,因为运营商寻求优化碳氢化合物回收并进行维护工作以确保井绕的完整性。传统的内部工作方法和技术,特别是在海上环境中的成本,可以为在下降领域完成的干预措施和类型的经济障碍。光井干预技术被认为是对老化海底井进行钻机干预的成本效益。运营商和服务提供商不断寻求开发在这些成熟生产Wellbores工作时减轻经济风险的技术和程序。在过去的几十年中一直在开发的一场革命涉及使用传统的光滑和电线来执行轻质井干预,而无需近海钻井或工作台。该过程采用光井干预船(LWIV),使用位于甲板的Moonpool,用于开放式接入,一种无形的压力控制包,通常涉及远程操作的车辆(ROV),以及传统的光线和电线干预套件的组合。使用这种技术适应的干预主要是为北海和墨西哥地区的北海和墨西哥海湾开发,并已广泛用于这些地区。然而,经过几年的规划后,该技术现在已经使用了第一次返回加拿大东海岸的运营商的几个井。在加拿大的三个单独的Wellbores issada中部署了光线,无异石,干预技术。这三个韦尔伯勒中的每一个都需要多种服务。运行常规的Slickline操作以准备每个井筒,并检索皇冠插头和传统漂移运行。然后,操作切换到电线服务,以执行诊断运行,然后执行纠正干预服务。一旦电动线服务完成,Slickline服务用于安全阀隔离和气体升力补救工作,然后将新配置的井返回生产模式。 LWIV的使用为操作员提供了一种有效的干预技术来评估和潜在地提高性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号