首页> 外文会议>International Gas Union Research Conference >'Electric power supply engineering for gas engine cogeneration system operation during a power outage'
【24h】

'Electric power supply engineering for gas engine cogeneration system operation during a power outage'

机译:“燃气发动机电源系统在停电期间的电力供电工程”

获取原文

摘要

1. Introduction While Gas Engine Cogeneration system (CGS) has spread as an energy-saving equipment, after the Great Japan Earthquake of March, 2011 CGS has been expected to reinforce power supply security for business continuity plans (BCP). So CGSs which can be under islanded operation have increased. However, 'islanded operation' cannot be realized by only CGS itself. It is realizable by engineering of CGS and load management.
机译:1.引言虽然燃气发动机热电联产系统(CGS)作为节能设备传播,但在日本大地震之后,2011年3月的CGS预计将加强业务连续性计划(BCP)的供电安全性。因此,可以在岛屿运作下的CGS增加。但是,“岛屿化操作”不能仅通过CGS本身实现。它是通过CGS和负载管理的工程来实现的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号