PDVSA Offshore Division develops The Mariscal Sucre Project with the exploitation of the gas fields Dragon, Patao, Mejillones and Rio Caribe located north of the Paria Peninsula, in Sucre State, Venezuela. For the Phase I of the Project two field production stages were planned. The first one includes the Dragon field's production by an accelerated production system and after that the inclusion of the Dragon and Patao field production through a platform. This work describes the installation campaign of the first four subsea tress in Venezuela corresponding to the subsea infrastructure of the Dragon Field's Accelerated Production System. This was a milestone that marked the history of the offshore industry in the nation. These trees are horizontal type and they are set for ten thousand pounds design pressure and a configuration that allow performing well interventions without removing the tree. The subsea trees installation was held with the support of a multipurpose vessel, two working class ROVs, tree handling tools, connection equipment, etc. The produced gas of the Dragon field during the Accelerated Production System will be collect by a 16 inch and 19 kilometer length pipeline the transported to shore through a 36 inch export pipeline for distribution in the internal market. The subsea system control will be manage by a control vessel and the gas dehydration will be handle for temporary skids located in the Conditioning Plant for the Internal Market (PAGMI) in the CIGMA complex. The Dragon field subsea production system will permit the delivery of 300 MMCFD of dry gas to the internal market achieving a social commitment with the gasification of the north east side of the country substituting liquid fuels which have a high value in the export market. This substitution will facilitate the production of the electric generation plants in that region.
机译:PDVSA海上司司开发了Mariscal Sucre项目,利用气田龙,帕美,Mejillones和Rio Caribe位于普瑞拉州的苏克雷州北部的北部北部。对于项目的I阶段,计划了两个现场生产阶段。第一个包括龙田通过加速生产系统的生产,并之后通过平台纳入龙和帕图田的生产。这项工作描述了委内瑞拉前四个海底吊带的安装运动,对应龙田加速生产系统的海底基础设施。这是一个有着里程碑,标志着近海行业的历史。这些树是水平类型的,它们设置为一万磅的设计压力和配置,允许在不删除树的情况下执行良好的干预措施。通过支持多功能船只,两个工人级罗维斯,树木处理工具,连接设备等举行了海底树。龙田的生产气体将收集16英寸和19公里长度管道通过36英寸出口管道运输到岸边,以便在内部市场分销。海底系统控制将由控制容器管理,气体脱水将处理位于CIGMA复合物中的内部市场(PAGMI)中的临时滑块。龙田海底生产制度将允许向内部市场提供300 MMCFF的干燥气体,以实现与出口市场具有高价值的国家燃料的液体燃料的社会承诺。这种替代将促进该地区的发电厂的生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号