Research on Countermeasures for Investment Estimate Precision of Power Distribution Grid Project in Inner Mongolia

机译:内蒙古配电电网工程投资估价精度的对策研究

获取原文

摘要

Given the characteristics of power distribution grid project including the huge amount of investment, long construction period, long investment payback period and so on, the precision of investment estimate has a tremendous influence on decision making, economic effect and cost control in each stage. By way of introducing the current situation of investment estimate of power distribution grid project, and analyzing the key factors affecting the investment estimate precision including investment decision-making and management, project design plans, risk and the investment estimate preparation, this paper puts forward improvement strategies aiming at influencing factors in order to promote the rapid development of power distribution grid project in Inner Mongolia.
机译:鉴于配电电网项目的特点,包括巨额投资,长施工期,长投资回收期等,投资估计的精度对每个阶段的决策,经济效益和成本控制有巨大影响。通过引入权力分配网格项目的投资估计现状,分析影响投资估算精度的关键因素,包括投资决策和管理,项目设计计划,风险和投资估算准备,提出了改进旨在影响因素的策略,以促进内蒙古权力分配网格项目的快速发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号