首页> 外文会议>Oil and gas environmental compliance conference >Secondary Containment: Regulations BMPs
【24h】

Secondary Containment: Regulations BMPs

机译:二级遏制:法规&BMPS

获取原文

摘要

1. If you are the owner or operator of an onshore oil drilling and workover facility, you must: 2. (a) Meet the general requirements listed under §112.7, and also meet the specific discharge prevention and containment procedures listed under this section. 3. (b) Position or locate mobile drilling or workover equipment so as to prevent a discharge as described in §112.1(b). 4. (c) Provide catchment basins or diversion structures to intercept and contain discharges of fuel, crude oil, or oily drilling fluids. 5. (d) Install a blowout prevention (BOP) assembly and well control system before drilling below any casing string or during workover operations. The BOP assembly and well control system must be capable of controlling any well-head pressure that may be encountered while that BOP assembly and well control system are on the well.
机译:1.如果您是陆上石油钻井和工作台的业主或运营商,您必须:2。(a)符合§112.7下列的一般要求,并符合本节下列的具体卸货预防和遏制程序。 3.(b)定位或定位移动钻孔或工作装置,以防止如第112.1(b)§112.1(b)所述的放电。 4.(c)提供集水区盆或转移结构,以拦截并含有燃料,原油或油性钻井液排放。 5.(d)在钻出任何套管弦或工作组运营期间,安装井喷防护(BOP)组件和井控制系统。 BOP组件和良好的控制系统必须能够控制任何可能遇到的良好头部压力,同时井下井组件和井控制系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号