Maximising Steam Project Value in South Oman through Flexible Development Phasing and Integrated Reservoir Surveillance

机译:通过灵活的开发阶段和集成水库监控,最大化南阿曼的蒸汽项目价值

获取原文

摘要

EOR is key to the longer term business performance of Petroleum Development Oman (PDO). The “A” Steam Project in Southern Oman is a large scale EOR project currently being executed by PDO. It comprises the re-development of the “A” West Field, which has a significant prior cold oil development history, and the new development of the nearby “A” East Field. The heavy viscous oil in both fields is contained in high net-to-gross braided river, aeolian and alluvial fan sandstones of the Cambrian Haima Group. Both fields were discovered in the 1970’s. The “A” West Field has lower oil viscosity and was first produced in 1976. “A” East oil is significantly more viscous than “A” West oil and was believed to be too viscous to be produced by cold production, so “A” East Field was not developed. By 2008, after some 30 years of cold oil production, an estimated 18% of the STOIIP had been recovered from “A” West and the water cut steadily increased to 95%. A field study was initiated in 2008 to evaluate re-development options based on EOR technologies. The selected Phase I (re-)development concept comprised a steam flood with fifty 10-acre / 7-spot patterns in “A” West and initial cyclic steam soak (CSS) with 74 wells on a regularly spaced 92 x 92 m grid in “A” East, with conversion later to a 8 acre / 9 spot steam flood. The two sub-surface developments were to be managed as an integrated project with shared surface facilities and operations. The project received FID for Phase I in 2009 and this is currently being executed. After the successful testing of cold production in selected new “A” East wells, a change to the Phase I FDP was implemented with the decision to cold produce the 32 most crestal wells prior to CSS in “A” East. To de-risk the project, the more complex “A” West Field is being re-developed in a phased manner. Following field trials, initial CSS is now used to improve the gross rate of poorly performing producers, which constitutes a change to the FDP. To investigate the economic benefits of alternative patterns in areas of the field where steam flooding efficiency appears to be low, injection has recently started in two patterns which will become 10 acre / 10 spot trials. Additionally seven 3.3 acre / 7 spot trial patterns are being drilled on the western edge of the 10 acre / 7 spot development area. Advanced time-lapse surveillance data acquisition techniques – DTS, DAS 3DVSP and HT optical pressure gauges-are deployed to support WRM optimization of the Phase I development, and to prepare the Phase II field (re-)development plan for the down-flank areas.
机译:EOR的关键是阿曼石油开发公司(PDO)的长期经营业绩。在“A”南汽阿曼项目目前正由PDO执行大规模EOR项目。它包括“A”西场,其中有一个显著前冷油发展历史的重新开发,和附近的“A”东田的新发展。在这两个领域的高粘度油中含有高净毛辫状河,寒海马集团的风积和洪积扇砂岩。这两个领域在20世纪70年代被发现。的“A”西场具有较低的油粘度和最早在1976年制造的“A”东油是显著比“A”西油更粘和被认为是太粘而不能由冷生产来制造,所以“A”东田没有开发。到2008年,经过近30年冷油的生产,该STOIIP的估计18%已经从“A”西回收,含水率稳步上升至95%。实地研究于2008年开始评估基础上提高采收率技术重新开发选项。所选择的第一阶段(重新)发展的概念由蒸汽驱与74个孔中的“A”和西初始循环蒸汽泡50 10英亩/ 7-斑点图案(CSS)上的规则间隔的92 X92米电网“A”东,与转换后的8英亩/ 9点蒸汽驱。两个子面发展是与共享的地面设施和运营于一体的综合项目进行管理。该项目于2009年获得FID一期,这是当前正在执行。冷采在选定新的“A”东口井的试验成功后,更改了一期FDP与决定冷生产之前的32口最脊井CSS实施了“A”地区。要取消的风险项目,更复杂的“A”西场正在分阶段重新开发。继田间试验,初步CSS现在用于改善表现不佳的生产者的总收益率,从而构成变化的FDP。调查的替代模式在蒸汽驱效率似乎是低场区域的经济利益,注射最近开始在两种模式,这将成为10英亩/ 10点试验。此外73.3英亩/ 7斑点试验图案被钻在10英亩/ 7点开发区域的西部边缘。先进的时间推移监控数据采集技术 - DTS,DAS 3DVSP和向下侧翼地区的HT光学压力表,部署在一期开发的支持WRM优化,并准备二期场(再)发展计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号