首页> 外文会议>Hydrovision International Conference and Exhibition >SHIFTING HYDRO GENERATION COSTS / DECLINING PERFORMANCE
【24h】

SHIFTING HYDRO GENERATION COSTS / DECLINING PERFORMANCE

机译:改变水电成本/表现下降

获取原文

摘要

Hydro generation has been traditionally known for its low operating costs and high performance levels for many years. However, the industry has as encountered strong headwinds in the last 10-15 years in the form of increased regulatory mandates, burgeoning internal support services costs and an aging asset base that demands attention and resources. These factors have combined to alter how hydro’s limited resources are being distributed among competing demands for dollars in their operating budgets. The shifts in spending are not good: regulatory and support services costs are building and siphoning valuable dollars from routine operations and maintenance accounts at an alarming rate.
机译:随着其低运营成本和高性能水平,水电一代传统上已知多年。 然而,该行业在过去10-15年中遇到了强大的逆风,以增加的监管机构,蓬勃发展的内部支持服务成本和需要关注和资源的老化资产基础。 这些因素组合以改变水电有限的资源在其经营预算中的竞争需求中如何分发。 支出的转变不好:监管和支持服务成本正在令人震惊的速度建立和虹吸有价值的美元,以令人震惊的速度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号