首页> 外文会议>SPE Deepwater Drilling and Completions Conference >Planning for a Necessary Evil in Deepwater Operations:Remedial Cementing
【24h】

Planning for a Necessary Evil in Deepwater Operations:Remedial Cementing

机译:规划深水操作中必要的邪恶:补救削弱

获取原文
获取外文期刊封面目录资料

摘要

Drilling operations are presented with challenges for both normal and complex wellbore environments with a focus on minimizing nonproductive time while successfully achieving the well objectives.In some cases,it is likely to reach the well objectives and remedial cementing may play a significant part whether it is due to exploration or wildcat-type wells,complex well construction,or the geological uncertainties. As a necessary evil,being able to plan for contingencies and success when faced with remedial cementing applications can reduce the potential replication of treatments and improve the extent of nonproductive time. When these situations arise during deepwater operations,there are challenges beyond the traditional cementing scope of work such as multiple temperature and pressure gradients,subsea equipment,and large-bore tubulars.Drilling deeper these factors may also include lithology,wellhead clearances,stuck pipe,failure of barriers,and/or an unstable well.Furthermore,traditional service tools find limited success with remedial operations in large-bore casing/tubulars,often requiring alternative solutions,including pumping through bottom hole assemblies,using inflatable packers,and developing other non-traditional placement techniques. This paper will present methods to improve the success of cement placement while performing remedial cementing operations in an effort to reduce nonproductive time and execute common contin-gency planning.In addition,specific well situations and events executing these methods will demonstrate the impacts to remediate the necessary evil.
机译:钻井作业呈现出正常和复杂的井筒环境的挑战,重点是最大限度地减少了非培养时间,同时成功实现了井目标。在某些情况下,它可能达到井的目标,并且补救胶化可能会发挥重要作用由于勘探或野猫型井,复杂的井结构或地质不确定性。作为必要的邪恶,能够在面对补救胶化应用时计划突发事件和成功可以减少治疗的潜在复制,提高非培养时间的程度。当这些情况发生在深水行动期间时,超出了传统的巩固工作范围,如多重温度和压力梯度,海底设备和大孔管道的挑战。更深的这些因素也可能包括岩性,井口间隙,卡住管道,障碍物失败,和/或不稳定的井。传统的服务工具在大孔壳/管子中的补救措施找到有限的成功,通常需要替代解决方案,包括使用充气封装器泵送底部孔组件,以及发展其他非 - 传统的放置技术。本文将提高改进水泥放置成功的方法,同时执行补救措施,以减少非生产时间并执行普通的持续策划。此外,执行这些方法的特定井情况和事件将展示对修复的影响必要之恶。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号