Water Injection in Brown Field:Never Too Late

机译:棕色田间注水:永远不会太晚

获取原文

摘要

It has been observed that in many brownfields across the world having 25-30 years of production history,water injection projects were not undertaken to maintain pressure in earlier stage of the fields`life while the average reservoir pressure depleted well below the bubble point pressure.Is it too late to initiate water injection?Is it techno-economically justifiable? This paper attempts to explore these questions. It may be uneconomical and ineffective to carry out full field water flooding project in a marginal brown field.However, selective water injection to boost up pressure in carefully selected pockets of the reservoir might help gain significant incremental oil production.To restore the reservoir pressure back to the original bubble-point pressure might be unnecessary and uneconomical.However,it might be sufficient to pressure up the reservoir to critical gas saturation pressure,enough to arrest the excessive gas production helping more oil to produce. In our case studies,we studied one of the stacked reservoirs of a large(8km x 12 km)oil field in offshore Peninsular Malaysia,at a water depth of about 70 meters.This maturing offshore reservoir with 25 year of production history consists of multiple interdependent closures with relatively thin oil columns and large gas caps with roughly 1.8 BSTB STOIIP.The reservoir communicates with nine neighboring producing fields via a common regional aquifer encompassing an area of more than 7000 square kilometers. As of Q2 2013,the field produced 29%of STOIIP.Gas injection was initiated in some parts of the field.However,no water injection scheme implemented.Simulation studies estimated that no further activity scenario would yield only an additional 1%recovery by year 2021(i.e.EUR 30%).However,initiating selective water injection even at such a late stage can significantly boost the oil recovery by about 5%,making it a viable commercial proposition.
机译:据观察,在整个有25 - 30年生产历史的世界上许多棕地,水针剂项目没有进行,以保持fields`life的前期压力,而平均储层压力消耗远低于泡点压力。难道是来不及启动注水?是技术 - 经济合理?本文试图探讨这些问题。这可能是不经济的和无效的,进行全域水驱项目在边缘褐色field.However,选择性注水提高了压在水库可能有助于增益精心挑选的口袋显著的增量石油production.To恢复储层压力回到原来的泡点压力可能是不必要的和uneconomical.However,它可能是足够的压上去贮存到临界气体饱和压力,足以阻止过多的气体生产帮助更多的油来生产。在我们的案例研究,我们研究了大(8公里×12公里)油海上马来西亚半岛场的堆放水库之一,在约70 meters.This成熟的离岸水库25年的生产历史的水深由多个的相互依赖封闭件具有相对薄的油柱和大气帽与大致1.8 BSTB STOIIP.The储层连通与九个相邻经由公共区域含水层包围的7000多平方公里生产油田。由于2013年第二季度中,现场生产STOIIP.Gas注射的29%是在field.However一些地区发起的,估计也没有进一步的活动的情况会产生只有每年增加1%的回收率不注水方案implemented.Simulation研究2021(ieEUR 30%)。然而,即使在这样的后期启动选择性水注入可以显著约5%提高油回收,使其成为一个可行的商业命题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号