Stress and Displacements Analysis for Drilling Mast Elements Made of Rectangular Pipe under the Action of the Wind as a Hurricane

机译:钻井桅杆元件的应力与位移分析,矩形管道下的矩形管作为飓风

获取原文

摘要

According to API 4F, SR EN ISO 14693:2004, the action of wind as a hurricane, with a speed of 120 km/h, represents a special load the drilling masts, which are a part of the drilling rigs, are submitted to. By their construction, the masts are multiple statically indetermined structures, made of many welded ends beams, and are designed as a component of the hoisting system, having some main purposes as supporting devices as the crown block at the top, the crane, the rotary swivel etc and providing support for the drill pipes to be stacked vertically during the round trips operations. In the present paper was analyzed, from this point of view, a drilling mast prototype made of rectangular pipes, rated for a maximum hook load of 300 kN. The authors calculated the wind pressures, in accordance with the formulae specified in the standards, and introduced this special loading as a distributed load, firstly on the transversal direction of the mast and then on the longitudinal direction, with respect to the spatial reference system attached to the analyzed mast. Using the Finite Element Method, the nodes displacements and mast's elements stress were determined. The most important obtained values of the displacements and stress were graphically shown and commented and, also, interesting conclusions are presented concerning the drilling mast resistance in specific conditions that occur in case of the wind action as a hurricane, as a premiere contribution for this new design of mast.
机译:根据API 4F,SR EN ISO 14693:2004,风作为飓风的动作,速度为120 km / h,代表了一个特殊的装载,钻井桅杆,这些钻井桅杆是钻井钻机的一部分。通过其结构,桅杆是多种静态不确定的结构,由许多焊接端梁制成,并且设计为提升系统的部件,具有一些主要目的作为支撑装置作为顶部的冠块,起重机,旋转在圆形旅行操作期间,旋转等并提供对钻管垂直堆叠的支撑。在本文中分析了,从这个角度来看,钻孔桅杆原型由矩形管道制成,额定最大钩载为300kN。作者根据标准中规定的公式计算了风压,并首先将该特殊装载作为分布式负载,首先在桅杆的横向方向上,然后在纵向方向上相对于所附的空间参考系统到分析的桅杆。使用有限元方法,确定节点位移和桅杆元素应力。以图形显示和评论的流离失所和压力最重要的价值,而且还提出了有趣的结论,介绍了在风力行动作为飓风的情况下发生的具体条件下的钻井肥大性,作为这种新的首映贡献桅杆设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号