首页> 外文会议>International Conference of DAAAM Baltic Industrial Engineering >BALANCING COMPLETION TIMES FOR MULTI-VEHICLE DELIVERY WITH TIME VARIOUS VEHICLE SPEEDS
【24h】

BALANCING COMPLETION TIMES FOR MULTI-VEHICLE DELIVERY WITH TIME VARIOUS VEHICLE SPEEDS

机译:平衡完成时间,用于多车辆交付随着时间的推移各种车辆速度

获取原文

摘要

An efficient heuristic to balance two vehicle delivery completion times is developed in this research. Vehicle moving speeds are assumed to be unsymmetrical between two points and time various. Delivery area divisions for each vehicle are made by modified sweep algorithm by adding two-stage reassignment procedure to resolve a possible unbalance of two vehicle delivery completion times. Three different size of common area are examined to determine the optimum size of common area. Vehicle delivery route is constructed by the 4-time-zone heuristic to avoid time various vehicle moving speeds situations efficiently.
机译:在这项研究中开发了一个有效的平衡两个车辆交付完成时间的启发式。在两点和时间之间假设车辆移动速度是不对称的。通过添加两级重新分配过程来解决每个车辆的送达区域部门,通过添加两级重新分配过程来解决两个车辆交付完成时间的可能不平衡。检查三种不同大小的公共区域以确定公共区域的最佳尺寸。车辆输送路线由4时区启发式构成,以避免有效地避免各种车辆移动速度的速度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号