首页> 外文会议>International Conference on Simulation and Modeling Methodologies,echnologies and Applications >A Simulation-based Optimization Approach for Stochastic Yard Crane Scheduling Problem with Crane Mobility Constraints
【24h】

A Simulation-based Optimization Approach for Stochastic Yard Crane Scheduling Problem with Crane Mobility Constraints

机译:基于仿真的随机围场起​​重机调度问题与起重机移动性约束的仿真优化方法

获取原文

摘要

With the fast-paced growth in containerized trade market the need for effective and efficient operations at container terminals is a critical factor in freight transport. One major contributing factor of terminal efficiency is the productivity of Yard Cranes (YC) resulting from YC scheduling. In this paper, the stochastic YC Scheduling Problem (YCSP) is presented aspiring to provide a new yard cranes analysis through operational attributes of the container handling process. A stochastic mixed integer programming model is proposed, and a simulation-based optimization procedure introduced to build YC schedules that account for the dynamic and uncertainty nature of container handling process in container terminals.
机译:随着集装箱贸易市场的快节奏增长,在集装箱码头上对有效和有效的操作的需求是货运的关键因素。终端效率的一个主要贡献因素是YC调度所产生的围场起重机(YC)的生产率。在本文中,提出了随机YC调度问题(YCSP),以提供通过集装箱处理过程的操作属性提供新的院子里起重机分析。提出了一种随机混合整数编程模型,并引入了一种基于仿真的优化程序,以构建YC计划,该时间表考虑了集装箱终端中容器处理过程的动态和不确定性性质。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号