The SPIRAL2 beam commissioning has started and the superconducting linac installation is being finalized. The conditioning of the Radio Frequency Quadrupole (RFQ) [1] begun in 2015, and the beam commissioning soon after. Among the beam parameters checked at the RFQ output, the energy, bunch length and longitudinal emittance have been measured for the 3 referenced particles.