首页> 外文会议>International Particle Accelerator Conference >The First Replacement of the RF Window of the ACS Cavity
【24h】

The First Replacement of the RF Window of the ACS Cavity

机译:第一次更换ACS腔的RF窗口

获取原文

摘要

In 2013, the Annular-ring Coupled Structure (ACS) cavities were installed to the Japan Proton Accelerator Research Complex (J-PARC) linac. Since then, the ACS cavities have been stably running. Although any serious problem induced by the RF window had not yet observed, we decided to replace the RF window of one ACS cavity by the newly manufactured one. The major motivations of the replacement are to check the surface condition of the RF window which have been under operation for nearly five years, to confirm that the new RF window fully meets specifications, and to learn how much time is required for high-power conditioning of the new RF window. By making use of the summer maintenance period of 2018, we carried out the replacement. This was the first experience for us to replace the RF window installed to the ACS cavity in the linac accelerator tunnel. As for the removed RF window, there was no any abnormal warning found with the visual examination. At the resuming of the cavity operation after the maintenance period, we conducted the high-power conditioning in a measured manner. It took around fifty hours so that the targeted peak power was stably input to the cavity through the new RF window. The ACS cavity with the new RF window is now stably operating.
机译:2013年,环形环耦合结构(ACS)空腔安装在日本质子加速器研究复合物(J-PARC)LINAC上。从那时起,ACS腔一直稳定地运行。虽然RF窗口引起的任何严重问题尚未观察到,但我们决定通过新制造的一个替换一个ACS腔的RF窗口。替代的主要动机是检查近五年的RF窗口的表面状况,以确认新的RF窗口完全满足规格,并学习高功率调理需要多少时间新的RF窗口。通过利用2018年的夏季维护期,我们进行了替代品。这是我们将安装到Linac加速器隧道中ACS腔安装到ACS腔的RF窗口的第一个经验。至于删除的RF窗口,目视检查没有任何异常警告。在维护期后的腔操作恢复时,我们以测量的方式进行高功率调节。它需要大约五十个小时,使目标峰值功率通过新的RF窗口稳定地输入到腔体。具有新RF窗口的ACS腔现在稳定运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号