首页> 外文会议>International Seminar on Tailings Management >(8)Tailings Deposits Considerations Regarding Existing Regulations in Chile
【24h】

(8)Tailings Deposits Considerations Regarding Existing Regulations in Chile

机译:(8)尾矿存款智利现行法规的审议

获取原文

摘要

This article presents an analysis of some technical applications included in existing norms(regulations or guidelines) which are applicable in Chile to tailings deposits, mainly regulationsestablished by the DGA (General Directorate for Water) of the Ministry of Public Works andSERNAGEOMIN (National Mining and Geological Service) which reports to the Ministry ofMining. Considerations include return periods for the design of runoff diversion channels,gradients for deposition of thickened tailings, discharge of water in emergency situations,application of a safe distance from a failure hazard and stability studies for Phases III and IVmentioned in D.S. (Supreme Decree) 248. The difficulties of applying each aspect, their impact onthe project and operational utility are discussed and analyzed.
机译:本文提出了对现有规范(法规或指南)中包含的一些技术申请的分析,这些应用程序适用于智利尾矿存款,主要由公共工程和地质和地质国家采矿和地质的DGA(海水总局)规范。服务)向部门报告。考虑因素包括跳闸转移通道设计的返回期,用于沉积增厚尾矿的梯度,在紧急情况下排出水,从失败危害和稳定性研究的安全距离,阶段III和IVIMINION在DS(至高无上的法令)248中。讨论并分析了应用各方面的困难,它们对项目和运营效用的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号