Back calculation of excessive deformation on deep excavation

机译:深挖掘过度变形的回计算

获取原文

摘要

Excessive lateral deformation occurred during the excavation construction exceeded the design criteria. Scrutiny evaluation should be employed to investigate the factor triggering the problems. The evaluation was conducted using numerical analysis by means of PLAXIS 2D 2011. Back calculation modeling results showed that soil investigation did not capture the field condition properly. The existence of small pound and stream next to the field was not taken into account due to the distance of borehole location. Structural work was proposed to overcome the excessive lateral deformation.
机译:在挖掘结构期间发生过多的横向变形超过了设计标准。应采用审查评估来调查引发问题的因素。通过通过Plaxis 2D 2011使用数值分析进行评价。背部计算建模结果表明,土壤调查没有正确捕获现场条件。由于钻孔位置的距离,未考虑该领域旁边的小磅和流的存在。提出了结构性工作来克服过度的横向变形。