The excavation of the tunnel will inevitably cause the displacement of soil layer, and then further threatens the safety of high-speed railway operation. Under the engineering background of high-speed rail's box culvert, using the technique of MIDAS/GTS, the establishment is based on 3 d finite element model of tunnel, soil mass and box culvert, to analyze the effects of box culvert settlement that led by shield tunnel excavation. The research indicates that tunnel excavation causes settlement of box culvert to some large extents, the soil mass should be reinforced to ensure the safety of the high-speed railway operations during the shield construction.