首页> 外文会议>International Conference on Mechatronics and Control Engineering >Single-Machine Scheduling with Due-Window Assignment and Rate-Modifying-Activities under a Deteriorating Maintenance
【24h】

Single-Machine Scheduling with Due-Window Assignment and Rate-Modifying-Activities under a Deteriorating Maintenance

机译:单机调度与窗口分配和速率修改 - 在恶化维护下的活动

获取原文

摘要

This paper studies single-machine scheduling problems with a due-window assignment and a rate-modifying activity under a deteriorating maintenance consideration simultaneously. Jobs completed within the due-window incur no penalties, other jobs incur either earliness or tardiness penalties. The maintenance activity can be scheduled immediately after any one of the completed jobs. We assume that once the maintenance activity has been completed, the machine efficiency will be improved and the machine maintenance duration depends on its starting time. The objective is to find the optimal maintenance position as well as the optimal size and location of the due-window, and the sequence of jobs to minimize a cost function based on the window size and window location and the earliness and tardiness of the jobs. We propose a polynomial time algorithm to solve the problem optimally.
机译:本文研究了单机调度问题,同时在维护考虑恶化的维护考虑下的速率修改活动。工作在适当窗口内完成的乔布斯突然没有处罚,其他工作要么令人沮丧或迟到的处罚。在任何一个完成的作业之后,可以立即安排维护活动。我们假设一旦完成维护活动,就会提高机器效率,机器维护持续时间取决于其开始时间。目标是找到最佳的维护位置以及窗口的最佳大小和位置,以及基于窗口大小和窗口位置以及作业的重点和迟到的工作序列。我们提出了一种多项式时间算法来解决问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号