首页> 外文会议>International Conference on Robust Manufacturing Control >Evaluating Lead Time Standard Deviation with Regard to the Lead Time Syndrome
【24h】

Evaluating Lead Time Standard Deviation with Regard to the Lead Time Syndrome

机译:评估关于铅时间综合征的提前期标准偏差

获取原文

摘要

Extending lead time standard deviation is a key figure that directly influences the due date reliability of a production process. Extending or reducing the planned lead time when trying to improve the due date reliability, does not only change the mean lead time, but also strongly affects the value of the lead time standard deviation. This connection is also associated with the Lead Time Syndrome of production control, which serves as a discussion framework. The aim of this paper is to investigate the lead time standard deviation influencing variables. As a result, various triggers of standard deviation will be discussed.
机译:延伸的提前期标准偏差是直接影响生产过程的截止日期可靠性的关键图。 在尝试提高截止日期可靠性时延长或减少计划的提前期,不仅改变平均报酬时间,而且强烈影响了提前期标准偏差的值。 这种连接也与生产控制的铅时间综合征有关,它用作讨论框架。 本文的目的是研究影响变量的铅时间标准偏差。 结果,将讨论各种标准偏差的触发器。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号