首页> 外文期刊>CIRP Annals >Consequences of planned lead time adaptions in scope of the Lead Time Syndrome of Production Control
【24h】

Consequences of planned lead time adaptions in scope of the Lead Time Syndrome of Production Control

机译:生产控制提前期综合症范围内计划的提前期适应的后果

获取原文
获取原文并翻译 | 示例
           

摘要

If order due dates are missed, a frequent reaction of production planners is to adapt planned lead times. How often and to what extent updates are reasonable has previously been unclear because, while trying to improve logistic target achievement, the opposite effect may be caused, which is known as the Lead Time Syndrome of Production Control. This paper investigates correlations between Lead Time Syndrome variables using a control theoretic model to gain knowledge about system transient response and the influence of the lead time updating frequency and information delay on due date reliability. These investigations lead to fundamental improvements in practice in setting planning parameters.
机译:如果错过了订单到期日期,生产计划人员的经常反应是调整计划的交货时间。以前尚不清楚更新的频率和合理程度,因为在尝试提高后勤目标的实现时,可能会产生相反的效果,这被称为生产控制的提前期综合症。本文使用控制理论模型研究提前期综合症变量之间的相关性,以获取有关系统瞬态响应的知识,以及提前期更新频率和信息延迟对到期日可靠性的影响。这些调查导致在设置计划参数方面实践上的根本改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号