首页> 外文会议>International Conference of Environmental Science and Engineering >Feasibility Study on Step Method Excavation of Tunnels with Large Cross Section and Small Interval
【24h】

Feasibility Study on Step Method Excavation of Tunnels with Large Cross Section and Small Interval

机译:大横截面隧道步进方法挖掘的可行性研究

获取原文

摘要

Based on the analysis of monitoring data in the construction of Linwu Tunnel and the numerical simulation of construction sequences by software Ansys, the paper calculated values of ground settlement and vault settlement in program of step method excavation; and analyzed the influences between excavation program and ground settlement, as well as vault settlement. It is feasible to use the program of step method excavation in areas of V-class surrounding rocks in Linwu Tunnels with large cross section and small interval, which offers great reference value to other similar projects.
机译:基于林威隧道施工监测数据的分析及软件ANSYS施工序列数值模拟,篇幅落地探矿综合函数及拱顶沉降价值;并分析了挖掘计划与地面结算的影响,以及拱顶沉降。在Linwu隧道围绕岩石围岩区域的围岩区域中使用跨级岩石的区域和小间隔,是可行的,这为其他类似项目提供了很大的参考价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号