Influence of strata pre-reinforcement on the tunnel and the surrounding strata while shield tunnel crosses beneath intercity high-speed rail

机译:地层预加固对隧道和周围地层的影响,同时屏蔽隧道横跨城市间高速轨道

获取原文

摘要

In view of that the construction period of shield crossing beneath high-speed rail is apt to cause soil deformation and large differential settlement of ballastless track plate and of the long-term implications on the tunnel structure of the train cycle dynamic load in operating period, with the project of shield crossing intercity in Suzhou as example, the paper determines pre-reinforcement method before crossing project, applies numerical simulation to analyze the influence of pre-reinforcement on the tunnel itself and surrounding strata, then derives the rule of pre-reinforcement on reducing soil deformation and tunnel internal force. The research gives that grouting in main and secondary reinforcement area will apparently reduce settlement deformation, jet grouting pile controls surface deformation well and soil pre-reinforcement will reduce a lot of shield tunnel segment internal force caused by high-speed rail operation.
机译:鉴于高速轨道下面的盾构交叉的施工周期易于造成碴轨道板的土壤变形和大型差动沉降,以及在运行期间火车循环动态负荷的隧道结构的长期影响,随着苏州的盾构横穿跨度的项目,例如苏州的例子,在交叉项目之前确定预加固方法,适用数值模拟,分析预加固对隧道本身和周围地层的影响,然后源于预加固规则减少土壤变形与隧道内力。该研究使主要和二级强化面积的灌浆显然会降低沉降变形,喷射灌浆桩控制表面变形井和土壤预加固将减少大量盾构隧道段内部力引起的高速轨道操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号