首页> 外文会议>SPE/IADC Middle East Drilling Technology Conference >“External Casing Patch: A New Approach To Recomplete The Gas Wells With Cemented Completions”
【24h】

“External Casing Patch: A New Approach To Recomplete The Gas Wells With Cemented Completions”

机译:“外壳贴片:一种重新完成煤气井的新方法,巩固完井”

获取原文

摘要

In search of increasing gas production in the Sultanate of Oman, PDO’s well engineers face challenges during the exploration of unconventional gas reservoirs. The cost-effective development of those deep tight gas reservoirs requires high fraccing pressure and special completion designs. In the last few years, the procedure to address those challenges ended up being completion failures that occurred during and after high pressure frac jobs, forcing operational teams to shut down several high-potential wells for long periods of time. Those inactive gas wells are awaiting effective, remedial solutions or, on the other hand, be recompleted. However, the cemented-completion type of well design implemented by PDO since mid-late 2000’s and widely used in most deep gas wells reduces the options to the minimum due to inability to replace existing 4?”x5?” completions. The fit-for-purpose technique selected to minimize the operational and financial impact of having high-risk, unusable gas wells was a ‘external casing patch’. Such initiative opened a window of opportunities to recover the desired gas production and to continue with planned development phase of the field without jeopardizing the integrity of those wells and the surrounded facilities. The implementation and subsequent optimization of this well-known technology will ensure reliability of the further cemented-completion operations and accountability of gas reserves.
机译:寻找阿曼苏丹国苏丹国的天然气生产,PDO在探索非传统气体水库期间面临挑战。这些深层储气储层的成本效益发展需要高毛细建数的压力和特殊的完工设计。在过去的几年里,解决这些挑战的程序最终完成了在高压Frac工作岗位期间和之后发生的完成失败,迫使业务团队长时间关闭几个高潜在的井。那些不活性的气体井正在等待有效,补救措施或另一方面重新完成。然而,由于2000年代中期以来的PDO实施的井设计的井设计类型的井设计在大多数深气井中,由于无法更换现有4?“X5?”完成。选择的适当技术,以最大限度地减少具有高风险,不可用的气井的操作和财务影响是“外壳贴片”。此类倡议开辟了一个机会窗口,以恢复所需的天然气生产,并继续进行该领域的计划发展阶段,而不会危及这些井和周围设施的完整性。本众所周知的技术的实施和随后的优化将确保进一步的水泥完成操作和天然气储备责任的可靠性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号