Unimin's Sustainability Manager - Mineral Sands saw on 29th July 2010 the potential for wind power in the eastern section of the Ibis mine area while exploring for an outcome of an alternative energy project that is capable of providing sustainable power solutions for post mining on North Stradbroke Island (NSI), east of Brisbane. Compare this with Flinders Island, situated mid-Bass Strait and exposed to Roaring 40s, having one of the best wind regimes in the world but solar irradiation is low during winter. The overarching development concept is a precinct solution at Edge Of Grid and electricity distribution utility has confirmed that NSI qualifies as such irrespective of proximity to Brisbane (population 2,146,577 in 2011). North Stradbroke Island is adjacent to the Gold Coast boasting 300 sunny days a year yet where the wind regime is rarely Roaring 40s strength. Resort occupancies on NSI are highly seasonal so behind-the-meter energy efficiency improvements and solar PV/energy storage installation is restricted to "below firm load" in the current regulatory environment. A recent regulatory study by an electricity distribution utility at external examples of Edge Of Grid shows there is a local community level benefit for meeting the firm load of a community before Power Purchase Agreement (PPA) actually needs to be considered, that is no export from zone transformers. But integration of many energy storage and renewable generation units into a distribution network substation at NSI possibly will have significant implications for means of peak demand management, the coordination 110/11kV Tap Changers, effective fault level for safe protection operation and commissioning tests of the coordinated system, because the required control system differs radically from previous schemes (shedding hot water loads, etc.). Distribution Zone Substation refurbishment project and a project to proactively solve Emerging Distribution Network Limitations is an archetypal capital deferral for electricity distribution utilities. These two projects de-constrain and de-risk the distribution network for major energy investment streams on the other side of distribution network connection points. The latter of these projects requires an Integrated Volt/VAR Control (VVC) Decentralized with Distributed Power System Auto-Control solution. A Circuit Reconfiguration Controller associated with VVC control area is needed for rapid fault location, isolation and supply restoration scenario and its implementation using IEC 61499 function blocks. One major investment stream is MW class solar PV facilities that may be located in areas that fit in with a very large protected area (80% of NSI) to become National Park by 2027 and could generate enough electricity to power nearly 900 homes on the Island. These developments are for Independent Power Producers (IPP) interested in the grid-connected supply of electricity generated by renewable energy under a long-term PPA. Thus, distribution network constraints on the corridor back to transmission substation may possibly lead to a runback scheme, thereby potentially increasing dimensions of technical issues. This paper studies potential technical issues associated with the integration of a multi-renewable Ethernet-based sustainable energy system on the consumer-side and within a conventional distribution network that has traditional distribution network constraints.
机译:Unimin的可持续发展经理 - 2010年7月29日矿物沙子在宜必思矿区东部的风力发电,同时探讨了一个替代能源项目的结果,该项目能够为北斯特拉德布罗克岛上挖掘的可持续电力解决方案提供可持续的电力解决方案(NSI),布里斯班以东。将此与弗林德斯岛相比,位于低音海峡,暴露在咆哮40年代,拥有世界上最好的风力制度之一,但在冬季太阳照射低。总体开发概念是电网边缘的精确解决方案,电力分配实用程序已证实,无论近距离布里斯班(2011年人口2,146,577人)是否有资格。北斯特拉德布罗克岛毗邻金海岸,每年享受300天的阳光灿烂的日子,而风制度很少咆哮40s强度。 NSI的度假胜地是高度季节性的,所以米后面的能效改进和太阳能光伏/储能装置限制在当前的监管环境中“低于坚定的负担”。最近通过电网边缘的外部示例的电力分配实用程序的监管研究显示,在实际需要考虑的电力购买协议(PPA)之前,符合社区的公司负担的当地社区一级益处,这是没有出口区域变压器。但是,许多能量存储和可再生生成单位在NSI的分销网络变电站中可能会对最高需求管理的方法,协调110 / 11kV抽头转换器,安全保护操作和调试测试的协调性能和调试测试中的分发网络变电站。系统,因为所需的控制系统与先前的方案(脱落热水负载等)不同地不同。分销区变速器翻新项目和一个主动解决新兴分配网络限制的项目是电力分配公用事业的原型资本推迟。这两个项目将分销网络连接点的主要能源投资流的分销网络解除约束和失败。这些项目的后者需要分流电源系统自动控制解决方案分散的集成Volt / var控制(VVC)。使用IEC 61499功能块需要快速故障定位,隔离和供应恢复方案及其实现需要与VVC控制区域相关联的电路重配置控制器。一项主要的投资流是MW类太阳能光伏设备,可以位于适合2027年的最大保护区(80%的NSI)的区域,以便在2027年成为国家公园,并且可以在岛上发电足够的电力电力近900个房屋。这些开发适用于对长期PPA下可再生能源产生的网格连接电力电网的独立电力生产商(IPP)。因此,走回传输变电站的分配网络约束可能导致回浪方案,从而可能增加了技术问题的维度。本文研究了与在消费者方面的基于多可再生以太网的可持续能源系统和具有传统分销网络限制的传统分销网络中集成相关的技术问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号