The relevance and the implications of Distributed Resources (DR) to the Network Services provided by network services providers is trying to undergo a revolution, which reflects the strong emphasis being placed on the uptake of DR within the energy policies of many countries. However, a bottleneck has formed through the inability of the energy networks to respond to the needs of DR at the volumes which would reflect the aspirations of the policy makers. This paper explores the idea that if the connection requirements of DR were integrated into the NSPs' planning processes then, more convenience and assurance could be achieved for DR proponents, thereby reducing the well-known non-price barriers to DR connection that has been a back-wind in realising the energy policies of many jurisdictions. The approach suggested in the paper, is to consider the accommodation by NSPs of the needs of DR, (whether it be wind resource, or PV, or a range of other resources such as intermittent storage), as a range of new Network Services that an NSP needs to provide at its points of interconnection with the grid. Then, through the normal Planning Process, and through the governance provided by the regulator, an NSP can work systematically, a) to define the levels of the new Network Services that it is able to provide at each POI; and b) to match the network capability to the expected demands for these Services that will manifest over the current planning cycle. Any shortfall can then be made good through the normal regulatory approval of CAPEX. Certainty is provided to prospective DR connectors through framing the new Network Services so as to be supportive and complying with their needs. However the expected impacts on the network of the forecast demand for DR connections, and therefore the new network services, are determined by the normal techniques of simulation utilised in a standard planning processes.
机译:网络服务提供商提供的分布式资源(DR)对网络服务的相关性和影响,正试图经历一场革命,这反映了对许多国家能源政策中的博士的强调的强烈重点。然而,通过能量网络无法反应能够反映政策制定者愿望的卷的需求来形成瓶颈。本文探讨了,如果DR的连接要求集成到NSPS的计划流程中,那么对DR激素可以实现更多便利性和保证,从而降低了博士连接的众所周知的非价格障碍反向风实现许多司法管辖区的能源政策。本文建议的方法是考虑由NSP的博士的需求的住宿,(无论是风资源,或PV,还是其他资源,如间歇存储),作为一系列新的网络服务NSP需要在其与网格互连的位置。然后,通过正常规划过程,并通过监管机构提供的治理,NSP可以系统地工作,a)来定义它能够在每个POI提供的新网络服务的水平; b)将网络能力与在当前规划周期上显示出现的这些服务的预期要求。然后可以通过CAPEX的正常监管批准进行任何差额。通过框架新的网络服务来提供潜在的DR连接器来提供确定性,以便支持并符合其需求。然而,对DR连接的预测需求网络的预期影响以及新的网络服务是由标准规划过程中使用的正常模拟技术确定的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号