首页> 外文会议>International Conference on Acid Rock Drainage >Commercial Case Studies of Life Cycle Cost Reduction of ARD Treatment with Sulfide Precipitation
【24h】

Commercial Case Studies of Life Cycle Cost Reduction of ARD Treatment with Sulfide Precipitation

机译:硫化物沉淀的商业周期成本降低生命周期成本降低

获取原文

摘要

Sulphide-based precipitation of divalent metals has been shown to greatly reduce life cycle costs and waste generation for the treatment of acid rock drainage (ARD) at mine sites. BioteQ's ChemSulphide~R process has been applied in multiple countries and continents and has proven to be a more cost effective solution than HDS or LDS lime plants on their own. Two case studies are presented in which the ChemSulphide~R process has been applied to reduce the life cycle cost of water treatment at sites facing active ARD treatment in perpetuity. The case study examines the lessons learned and causes of plant downtime at the Wellington Oro water treatment plant. The plant, which has been operating for over five years, has continually been able to meet strict discharge requirements for cadmium and zinc while entirely eliminating the production of waste sludge, however mechanical and secondary process issues had reduced plant availability. Lessons learned and mitigation methods that are currently being implemented are presented and discussed. The second case study looks at the ChemSulphide~R plant installed upstream of a HDS lime neutralization plant treating ARD at the Yinshan Mine in China. The plant selectively recovers copper as a commercial grade concentrate with the net revenues largely offsetting treatment costs to achieve both economic and environmental benefits. The net present value of the savings generated by the ChemSulphide~R plants at Wellington Oro and Yinshan are also analysed and discussed.
机译:已经显示硫化物的二价金属沉淀,大大降低了矿位点治疗酸性岩石排水(ARD)的生命周期成本和废物产生。 Bioteq的化学硫化物〜r过程已应用于多个国家和大陆,并且已被证明是一种比HDS或LDS石灰植物更具成本效益的解决方案。提出了两种案例研究,其中已经应用了化学硫化物〜R过程,以降低在永久性ARD治疗的场地下水处理的生命周期成本。案例研究探讨了惠灵顿奥罗水处理厂的植物停机时间的经验教训。该植物已经运营了五年多年来,不断能够满足镉和锌的严格排放要求,同时完全消除了废物污泥的生产,但机械和次要的过程问题降低了植物可用性。提出和讨论了目前正在实施的经验教训和缓解方法。第二种案例研究看着在中国尹山矿治疗ARD的HDS石灰中和植物上游的化学硫化物〜R植物。该工厂选择性地将铜恢复为商业级集中,净收入主要抵消治疗成本,以实现经济和环境效益。还分析了惠灵顿奥罗和银山植物的净储蓄的净目的价值,并讨论了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号