首页> 外文会议>International Conference on Acid Rock Drainage >Up-Scaling from Trial to Operation: Practicalities of Construction and Permitting, Force Crag Mine
【24h】

Up-Scaling from Trial to Operation: Practicalities of Construction and Permitting, Force Crag Mine

机译:从审判到运营中的升级:建筑和允许的实用性,迫使裂缝矿

获取原文

摘要

Following successful small-scale compost-based bioreactor (tank size 3.75 m~3; flow rate 1.1 L/min) metal mine treatability trials undertaken by Newcastle University, a full-scale vertical flow pond treatment system was constructed in 2014 at the abandoned Force Crag Mine (Cumbria, UK). Metal concentrations in the mine water are sufficiently high to cause the receiving water course, the Coledale Beck, to fail UK environmental quality standards. The innovative system remediates the baseflow of mine water (6 L/s), which contains elevated concentrations of zinc (3.8 mg/L) in a treatment area of 1250 m~2 with a target residence time of -14 hours.Force Crag is a remote site located within a National Park that is popular with tourists and walkers. The mine site, including the underground workings, buildings and mine surface, are owned and managed by the National Trust (a UK historical conservation charity). Construction of a treatment system in this isolated, open access, rugged area resulted in challenges that needed to be considered in the design process. The novel nature of the treatment technology deployed at the site required any scheme to be designed to enable rigorous scientific investigation of the system to prove the design concept. Furthermore, operational issues (e.g. quantities of gas release) that could result from the full-scale system also needed to be addressed.All of these challenges were overcome, resulting in the successful delivery of a new treatment technology. This paper highlights the engineering and permitting aspects of up-scaling from a trial system to a full-scale novel treatment methodology.
机译:以下成功的小型基于堆肥生物反应器(罐尺寸3.75米〜3;流速1.1升/分钟)通过纽卡斯尔大学进行的金属矿处理性试验中,一个全规模垂直流动池处理系统是在2014年被遗弃的力构造Crag矿山(坎布里亚,英国)。矿井水中的金属浓度足够高,以引起接收水路,赌注贝克,以免英国环境质量标准失败。该创新的系统来补救矿井水的基流(6 L / S),它包含升高浓度的锌(3.8毫克/升)的在1250 M〜2的治疗区域与-14 hours.Force峭壁的目标停留时间是位于国家公园内的偏远地点,与游客和沃克一起受欢迎。矿场,包括地下运作,建筑物和地面,由国家信托(英国历史慈善机构)拥有和管理。在该隔离,开放式接入,坚固的区域的构造,导致设计过程中需要考虑的挑战。在现场部署的治疗技术的新颖性要求旨在旨在使对系统进行严格的科学调查来证明设计理念。此外,可能由全规模系统产生的操作问题(例如,气体释放量)也需要解决。克服了这些挑战,导致成功交付新的治疗技术。本文突出了从试验系统到全面新型治疗方法的工程和允许升级的工程方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号