首页> 外文会议>IAASS conference on safety is not an option >SYNTHESIS OF THE SRM FRAGMENTATION ACTIVITIES PERFORMED WITHIN VEGA PROGRAM
【24h】

SYNTHESIS OF THE SRM FRAGMENTATION ACTIVITIES PERFORMED WITHIN VEGA PROGRAM

机译:在VEGA计划内进行的SRM碎片活动的合成

获取原文

摘要

In the frame of VEGA program and especially the first flight on February 13, 2013, safety was a major concern. The default of the launcher and its impact on the close range were amongst the development phase topics because of the propellant masses at stake and the surrounding inhabited environment. A task group composed of members from ESA, CNES and industrial partners involved was formed for this matter. All SRMs are equipped with destruction chains. While P80 (first stage) is functioning, the Zefiri remain unpressurized. A scenario was set stating that the activation of Zefiri cutting chord creates an ignited gap inside the propellant. This ought to propagate till the inner bore, driving the explosion of the motor. This scenario was studied through small scale tests and numerical simulation, providing confidence on the feasibility of the destruction of the SRMs as well as inputs in terms of safety delays.
机译:在VEGA计划的框架中,特别是2013年2月13日的第一个航班,安全是一个主要问题。发射器的违约及其对近距离的影响是开发阶段主题,因为股权的推进群和周围的居住环境。为此问题形成了由ESA,CNES和工业伙伴的成员组成的任务组。所有SRMS都配备了销毁链。虽然P80(第一阶段)正常运行,但Zefiri保持不受压力。设定了一种情况,说明Zefiri切割和弦的激活在推进剂内产生了一种点火的间隙。这应该宣传到内孔,驱动电动机的爆炸。通过小规模测试和数值模拟研究了这种情况,对SRMS破坏的可行性提供了信心,以及在安全延迟方面的输入。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号