Analysis of project schedule risk indexes in PERT network using Monte Carlo simulation

机译:Monte Carlo仿真分析Pert网络中Pert网络中的项目时间表风险指标

获取原文

摘要

It is convenient and effective to use Monte Carlo simulation (MCS) technique in project schedule risk analysis and assessment, but at the same time, the indexes put forward by scholars up to now is quite few, leaving construction schedule risk assessment still difficult to carry out. Therefore, based on PERT network assumption, the shortcomings of current project schedule risk indexes are summarized and new project schedule risk index is put forward to estimate the criticality of each activity and path to provide more information for project schedule controllers. In the case studied, with the application of the new index, the critical index of each activity is given and divided into five levels, and the new index put forward in this paper shows great superiority over the classic indexes.
机译:使用Monte Carlo仿真(MCS)技术在项目时间表风险分析和评估中是方便和有效的,但同时,由学者提出的指数到现在是很少的,离开施工时间表风险评估仍然难以携带出去。因此,基于Pert网络假设,总结了当前项目时间表风险指标的缺点,并提出了新的项目时间表风险指数来估计每个活动和路径的关键性,以便为项目进度控制器提供更多信息。在研究的情况下,随着新索引的应用,每项活动的临界指数被给予并分为五个层次,本文提出的新指数显示出对经典指标的良好优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号