首页> 外文会议>International Conference on Mechanicalngineering, Industrial Electronics and Informatization >Optimization Research on the Bolt Arrangement of a Double-Wall Steel Insulation Silo with Multiple Bolted Joint
【24h】

Optimization Research on the Bolt Arrangement of a Double-Wall Steel Insulation Silo with Multiple Bolted Joint

机译:多螺栓连接双壁钢绝缘筒螺栓布置的优化研究

获取原文

摘要

Double-wall fabricated steel insulation silo with multiple bolted joints is a new structure form of silo. The number of bolt studs used in the 1000-ton silo is 12240 which take too much time and money. In order to cut down the cost and shorten the construction period, 6 alternative schemes are put forward to optimize the bolt arrangement. By comparison, Schemes 6 is adopted. The model which uses the original bolt arrangement is defined as Model 1. The optimized model is defined as Model 2. The stress and deformation of these two models were comparatively analyzed. The results show that the maximum stress and the maximum displacement of Model 2 are both smaller than the specified values. Furthermore, the number of bolt studs used in Model 2 is 6600 which is 5640 less than the original number. The bolt studs are saved 46.1%.
机译:双壁制造的钢绝缘筒仓,具有多个螺栓接头是一种新的筒仓结构形式。 1000吨筒仓中使用的螺栓螺栓的数量是12240,花费太多时间和金钱。为了减少成本并缩短施工期,提出了6个替代方案来优化螺栓布置。相比之下,采用方案6。使用原始螺栓布置的模型被定义为型号1.优化模型被定义为模型2.对这两种模型的应力和变形进行了相对分析。结果表明,模型2的最大应力和最大位移均小于指定值。此外,模型2中使用的螺栓螺栓的数量是6600,其比原始号码低5640。螺栓螺柱保存了46.1%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号