首页> 外文会议>International Conference on Vibration, Structural Engineering and Measurement >Design and Construction of Locking Steel Pile Cofferdam of South Tower Pile Cap for Taizhou Bridge
【24h】

Design and Construction of Locking Steel Pile Cofferdam of South Tower Pile Cap for Taizhou Bridge

机译:南塔桥锁桩围堰锁桩围堰的设计与施工

获取原文

摘要

South tower of Taizhou bridge is located in complex hydrogeological conditions,the amount of its excavation engineering is large.Combined with the successful application of locking steel pipe pile cofferdam in the south tower project of Taizhou Yangtze Highway Bridge,from comparison and demonstration, scheme design and construction, process monitoring to introduce locking steel pipe pile cofferdam in detail,using the classical method and the M method to design and calculation for supporting structure.Construction practice shows that the design and calculation of support structure is accurate,locking steel pipe pile fully played its function of sealing,it also has great rigidity, good integrity strong bending resistance and other advantages.The successfully application of this technology,promoting the technological progress of bridge foundation constructionthe in deep water or complex geological conditions,it provides a basis for the construction of similar projects in the future.
机译:台州桥南塔位于复杂的水文地质条件下,其挖掘工程的数量很大。随着锁定钢管桩围堰的成功应用,在台州市长江公路桥南塔工程中,从比较和示范,方案设计 和施工,工艺监测详细推出锁定钢管桩围堰,使用经典方法和M方法来设计和计算支持结构。构建实践表明,支持结构的设计和计算是准确的,完全锁定钢管桩锁定钢管桩 发挥了密封功能,它也具有很大的刚性,良好的诚信强度抗弯性等优点。成功应用了这项技术,促进了桥梁基础建设的技术进步,在深水或复杂的地质条件下,为此提供了基础 将来建设类似项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号