首页> 外文会议>International Conference on Vibration, Structural Engineering and Measurement >Risk Fuzzy Measurement and Early-warning of the Project In Material Supply Chain
【24h】

Risk Fuzzy Measurement and Early-warning of the Project In Material Supply Chain

机译:物料供应链项目的风险模糊测量和预警

获取原文

摘要

In the environment of network competition, it is a basic condition of stabilized operation to measure effectively the risk with early warning of the project of material supply chain system. From the angle of system, this paper analyzes the set of risk factors of the project of material supply chain, and provides a fuzzy method for the supply chain whole risk of measures. Making use of this method, we can acquire the valid early warning of the system risk of project of material supply chain, so as to solve the disadvantage of deviating between the risk analysis of system and node of the project of material supply chain, all which has profit to the risk managements of system effect of the project of material supply chain and the choice of cooperation contract company.
机译:在网络竞争环境中,它是稳定行动的基本条件,以有效地测量材料供应链系统项目预警的风险。从系统的角度来看,本文分析了材料供应链项目的危险因素集,为供应链的整体风险提供了模糊方法。利用这种方法,我们可以获得物料供应链项目的有效预警,以解决偏离材料供应链项目的系统和节点风险分析的缺点,所有这些有利于物资供应链项目的系统效应的风险管理和合作合同公司的选择。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号