Risk Fuzzy Measurement and Early-warning of the Project In Material Supply Chain

机译:物料供应链中项目的风险模糊测度与预警

获取原文

摘要

In the environment of network competition, it is a basic condition of stabilized operation to measure effectively the risk with early warning of the project of material supply chain system.From the angle of system, this paper analyzes the set of risk factors of the project of material supply chain, and provides a fuzzy method for the supply chain whole risk of measures.Making use of this method, we can acquire the valid early warning of the system risk of project of material supply chain, so as to solve the disadvantage of deviating between the risk analysis of system and node of the project of material supply chain, all which has profit to the risk managements of system effect of the project of material supply chain and the choice of cooperation contract company.
机译:在网络竞争的环境下,有效地对物料供应链系统项目的风险进行预警和预警是稳定运营的基本条件。物料供应链,为供应链整体风险的度量提供了一种模糊的方法。利用这种方法,可以获得物料供应链项目系统风险的有效预警,从而解决了偏差的弊端。在系统的风险分析和物料供应链项目的节点之间,对物料供应链项目的系统效果的风险管理和合作合同公司的选择都有好处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号