Results of a 43-101 Compliant Preliminary Feasibility Study for the Kuriskova Uranium-Molybdenum Project, Slovakia

机译:结果43-101符合Kuriskova铀 - 钼项目,斯洛伐克的初步可行性研究

获取原文
获取外文期刊封面目录资料

摘要

The Kuriskova uranium-molybdenum project is a high-grade deposit located in Eastern Slovakia. A 43-101 compliant preliminary feasibility study (PFS) was completed on Kuriskova in 2012. Highlights of the PFS will be discussed: The current Kuriskova resources are estimated at 28.5 million pounds of indicated U_3O_8 in 2.3 Mt grading 0.555 per cent U_3O_8 and 12.7 million pounds of inferred U_3O_8 in 3.1 Mt grading 0.185 per cent U_3O _8. Indicated mineral reserves were estimated at 2.5 Mt and an average grade of 0.346 per cent U with an underground mining rate of about 210 000 ore tons per year at an economic cut-off of 0.13 per cent U for approximately 13 years. The mine plan is based on an underhand drift and fill mining method utilising a roadheader as the primary production method. Metallurgical test results indicate uranium and molybdenum recoveries of 92 per cent and 87 per cent, respectively, using conventional alkaline leaching and precipitation circuits producing separate uranium (yellowcake) and molybdenum concentrates. The average annual production of concentrates would be approximately 786 t of uranium oxide (U_3O_8) and 84 t of molybdenum with a life-of-mine U_3O_8 production of 20.9 million pounds (9493 t). The base case internal rate of return is calculated at 30.8 per cent on a pretax basis with a 1.9 year payback on an estimated initial capital cost of US$225 M including contingency. A long-term uranium price of US$68/lb U_3O_8 was used in the study. At an eight per cent discount rate, the pretax net present value is estimated at US$276 M. Operating costs are estimated to be US$22.98/lb U_3O_8 over the mine life and during the first four years of production US$16.68/lb U_3O_8 including by-product credit for molybdenum.
机译:Kuriskova铀钼项目是位于斯洛伐克东部的高档矿床。在2012年Kuriskova上完成了43-101兼容初步可行性研究(PFS)。将讨论PFS的亮点:目前的Kuriskova资源估计为2850万磅,指出的U_3O_8,分级0.555%U_3O_8和1270万在3.1 mt分级0.185%u_3o _8中的3.1 mt磅。表明矿产储量估计为2.5吨,平均等级为0.346%,u百分之一,每年约210 000吨吨,经济截止量为0.13%,约13年。矿山计划基于利用道路主机作为初级生产方法的低手漂移和填充挖掘方法。冶金测试结果表明,铀和钼分别使用常规碱性浸出和沉淀电路分别显示92%和87%,产生单独的铀(黄饼)和钼浓缩物。浓缩物的平均产量约为786吨氧化铀(U_3O_8)和84吨,钼寿命为20.9百万磅(9493吨)。基本案例返回率在税前计算为30.8%,估计的1.9年回报率,估计初始资本成本为225亿美元,包括应急。研究中使用了68美元/磅U_3O_8的长期铀价。估计税率百分之八,税前净值估计为276美元,运营成本估计为矿山生活的22.98美元/磅U_3O_8,在生产的前四年中为16.68 / LB U_3O_8 - 用于钼的产品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号