首页>
外文会议>POWER-GEN Asia Conference and Exhibition
>Power- Gen Asia 2012 Track 1, Session 2: Indonesia’s Aggressive IPP Program: (1) the Dominance of Geothermal; and (2) Mine Mouth Projects(PPT)
【24h】
Power- Gen Asia 2012 Track 1, Session 2: Indonesia’s Aggressive IPP Program: (1) the Dominance of Geothermal; and (2) Mine Mouth Projects(PPT)
展开▼
机译:Power-Gen Asia 2012 Track 1,Session 2:印度尼西亚的侵略性IPP计划:(1)地热的主导地位; (2)矿井项目(PPT)
Second Fast Track Program 1. Regulation of Minister of Energy and Mineral Resources No. 15 of 2010 concerning of Project Directory List of Acceleration Development of the Power Plants utilizing Renewable Energy, Coal, and Gas and its Related Transmission (as amended by Regulation of Minister of Energy and Mineral Resources No. 1 of 2012). 2. Total Power Plants 2.1 48 Geothermal (50.5% of PLN & IPP projects) 2.2 11 Hydro (11.6% of PLN & IPP projects) 2.3 27 Steam (28.4% of PLN & IPP projects) 2.4 9 Gas & Steam (9.5% of PLN & IPP projects) 3. Total Power Plants 3.1 Renewable Sources (Geothermal & Hydro) 3.1.1 62.1% of PLN & IPP 3.2 Conventional Sources (Steam, Gas & Coal) 3.2.1 37.9% of PLN & IPP.
展开▼