首页> 外文会议>International Conference on Frontiers of Advanced Materials and Engineering Technology >The Study on Key factors Influencing Time Delay of Public Construction Project
【24h】

The Study on Key factors Influencing Time Delay of Public Construction Project

机译:影响公共建设项目时间延迟的关键因素研究

获取原文

摘要

Project delay is prevalent and common. How to control project delay effectively is crucial for improving project performance. The 6 kinds of factors Influencing Time delay are distinguished on basis of literature. According to the structural equation modeling analysis step, the data is analysis using SPSS13.0 and AMOS7.0. This paper has made the examination and obtained the final structural equation modeling. So it has provided role for preventing the delay of duration on public construction.
机译:项目延迟普遍且普遍。如何控制项目延迟有效地对提高项目性能至关重要。影响时间延迟的6种因素在文献的基础上区分。根据结构方程建模分析步骤,数据使用SPSS13.0和AMOS7.0进行分析。本文进行了检查并获得了最终的结构方程模型。因此,它为预防公共建设延迟持续时间提供了作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号