Construction Optimization of the Bridge-Tunnel Sections

机译:桥隧道段的施工优化

获取原文
获取外文期刊封面目录资料

摘要

The construction method of the joint section connecting bridge and tunnel was simulated by FEM. After Calculating and comparing the result of stresses and effect of displacement-control in the surrounding rock under three methods of construction, it shown that the side heading method was very advantageous for the stress concentration, and the CRD method provided a good control of bottom heave, as for the top heave, the double side heading method was more favorable. From the dynamic analysis, the vehicle load is found to have, though small, wide influence. What's more, the lapping distance between the bridge and tunnel is better more than 4m, and the influence from the high running speed should be paid attention to.
机译:通过FEM模拟连接桥和隧道的接合段的施工方法。在三种施工方法中计算和比较围岩中位移控制的应力和效果的结果之后,表明侧向测量方法对于应力浓度非常有利,并且CRD方法提供了对底部升降的良好控制作为顶部升降,双面标题方法更有利。从动态分析,发现车辆载荷虽然小,影响很大。更重要的是,桥梁和隧道之间的研磨距离更好超过4米,应注意高运行速度的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号