【24h】

Construction Optimization of the Bridge-Tunnel Sections

机译:桥梁隧道断面施工优化

获取原文

摘要

The construction method of the joint section connecting bridge and tunnel was simulated by FEM.After Calculating and comparing the result of stresses and effect of displacement-control in the surrounding rock under three methods of construction,it shown that the side heading method was very advantageous for the stress concentration,and the CRD method provided a good control of bottom heave,as for the top heave,the double side heading method was more favorable.From the dynamic analysis,the vehicle load is found to have,though small,wide influence.What's more,the lapping distance between the bridge and tunnel is better more than 4m,and the influence from the high running speed should be paid attention to.
机译:通过有限元法模拟了桥梁与隧道连接段的施工方法,在三种施工方法下对围岩的应力和位移控制效果进行了计算和比较后,表明侧向法是非常有利的。对于应力集中,CRD方法提供了良好的底部起伏控制,而对于顶部起伏,双向ing进法则更为有利。从动态分析中发现,车辆载荷虽然影响较小,但影响广泛此外,桥梁与隧道之间的搭接距离最好大于4m,并应注意高速行驶的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号