Balancing Project Schedule Cost on Sour Gas Development Project Case Study

机译:酸天然气开发项目案例研究平衡项目进度与成本

获取原文

摘要

The gas field development project is a challenging phase, since wells need to be drilled to assess the oil/gas reserves and production facilities need to be built. The ultimate objective of the project is to deliver the gas sales to selected buyers as per agreed schedule and price. As result, the project schedule and cost are defined to achieve the objective. Project schedule and cost are known to work in equilibrium. Where one of these dimensions is restricted or extended, the other dimension will then also need to be either extended/increased or restricted/reduced in some way. Given that quality must not be compromised, this paper aims to describe how to get the optimum balance of project schedule and cost on an onshore gas processing plant project located in north-east Indonesia with 90 MMSCFD feed gas capacity. The feed gas has a high content of CO2 and H2S. The schedule of the development project was initially divided into 2 phases: Early Production using sweet gas facilities will be constructed in 22 months and Complete Phase 1 with sour gas facilities will be constructed in 26 months. The project cost was developed by referring to third party cost estimates as part of FEED, to the most recent quotation from the vendor, and to the project cost owner. The Government had to approve the CAPEX of the project as part of the PSC scheme. Monte Carlo simulation was used to calculate risks related to schedule and cost estimates and furthermore to establish realistic ones. The simulation showed that p75 falls within 28 months and MUSD 200 for project phase-1 completion. However, according to its commitment to the gas buyer, the company has to deliver gas within a maximum period of 22 months, which makes this project very challenging.
机译:该气田开发项目是一个具有挑战性的阶段,因为井需要钻孔,以评估石油/天然气储量和生产设施需要建立。该项目的最终目标是为客户提供天然气销售给购房者选择按照商定的时间表和价格。作为结果,该项目进度和成本的定义来达到目的。项目进度和成本是众所周知的平衡工作。其中这些尺寸中的一个限制或延伸时,其他尺寸将这时也需要被任一延长/增大或限制/以某种方式降低。由于质量不能妥协,本文的目的是描述如何获得项目的进度和成本的最佳平衡在位于东北部与印尼90 MMSCFD进气能力的陆上天然气处理厂项目。进料气体具有CO 2和H 2 S的含量高。用甜美的天然气设施将是22个月来构造,并用酸气设施齐全,第一阶段将在26个月内构建早期生产:开发项目的时间表,最初分为2个阶段。该项目成本为参照第三方成本估计为原料的一部分,从供应商处的最新报价开发和项目成本所有者。政府已批准该项目的资本支出为PSC计划的一部分。蒙特卡罗模拟的方法与进度和成本估计计算风险,并进一步建立切合实际的。仿真结果表明p75的下降28个月和MUSD 200项目阶段1完成内。然而,根据其气体买家承诺,该公司拥有22个月的最长期限,这使得这个项目非常具有挑战性内输送天然气。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号