In July 2006 the first stone was laid for constructing the largest Gas To Liquids (GTL) plant in the world, the Pearl GTL Complex in Ras Laffan, Qatar. After completing Shell's first GTL plant in Bintulu, Malaysia in 1993 with a debottlenecked capacity of 14 kbbl/d, the Pearl GTL plant is a major leap forward in size, innovation and integration. Pearl GTL is designed to produce 140 kbbl/d of finished GTL products and some 120 kbbl/d of natural gas liquids, including field condensate and ethane. Raw feed gas is routed from 2 identical offshore Platforms in the Qatar North Field via 2 parallel 30" subsea pipelines to the onshore GTL manufacturing complex. The reliable, efficient and well integrated Feed Gas Preparation plant is a key enabler to the overall success of the Pearl GTL complex. Feed Gas Preparation includes offshore platforms, inlet receiving facilities, integrated gas treating units and NGL extraction/fractionation unit. The design of the Feed Gas Preparation complex is based on Shell's years of experience in designing, building, licensing and operating many Gas Processing & LNG plants. Due to the highly integrated design, implementation of significant technology innovations was executed only after thorough analysis and issuing of formal development releases. The Pearl GTL plant came into operation on 23rd March 2011. Stable production of sweet Natural Gas, Sulphur, Propane, Butane and Condensate at 40% design capacity was achieved within 10 days. The plant is meeting its design capacity and product quality, and complies with stringent environmental specifications. The innovative design approach used has resulted in a stable, reliable operation and has contributed to the sustainable development of the project. This paper describes in detail the configuration of the Feed Gas Preparation plant in Pearl GTL and highlights the key features in the design, construction, commissioning and start-up experiences.
机译:2006年7月,第一块石头奠定了世界上最大的气体(GTL)植物,在卡塔尔Ras Laffan中的珍珠GTL复合物。在1993年在1993年完成了贝壳的第一个GTL工厂,珍珠GTL工厂的脱果电容为14 kbbl / d,是大小,创新和整合的重大飞跃。珍珠GTL设计用于生产140 kbbl / d成品GTL产品,以及大约120 kbbl / d的天然气液体,包括现场冷凝物和乙烷。原料饲料气体通过2个平行的30“海底管道在卡塔尔北场的2个相同的海上平台上路由到陆上GTL制造综合体。可靠,高效,综合的饲料气体制备厂是整体成功的关键推动者珍珠GTL复合物。饲料气体制备包括海上平台,入口接收设施,集成气体处理单元和NGL提取/分馏单位。饲料气体制备复合物的设计基于壳牌的设计,建设,许可和运营方面的经验天然气加工和液化天然气植物。由于高度集成的设计,在彻底的分析和发布正式开发版本后,只有在彻底的分析和发布后执行了重要的技术创新。珍珠GTL工厂于2011年3月23日开始运作。稳定生产甜美天然气,硫,丙烷,丁烷和40%设计能力的缩合物在10天内实现。该植物见面其设计能力和产品质量,符合严格的环境规范。使用的创新设计方法导致了稳定,可靠的操作,并为该项目的可持续发展做出了贡献。本文详细介绍了珍珠GTL进料气体制备厂的配置,并突出了设计,施工,调试和启动体验的关键特征。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号