This paper introduces the "Levels of anchor cable +Bored piles +Net shotcrete" combined support plan's application in deep foundation pit engineering at Zhengzhou north freight marshalling station. Construction practice and monitoring data show that the engineering supporting design and construction have got an ideal effect, to ensure the safety of the north Ring Bridge and the railway line. It has a certain guiding significance to similar municipal engineering.
展开▼