首页> 外文会议>International Conference on Mechanical Science and Engineering >A Study of Process Rebuilding of Asset Life Cycle Management in Power Grid Enterprises Based on MIMS Diagnosis Model
【24h】

A Study of Process Rebuilding of Asset Life Cycle Management in Power Grid Enterprises Based on MIMS Diagnosis Model

机译:基于MIMS诊断模型的电网企业资产生命周期管理流程重建研究

获取原文

摘要

According to the demand of asset life cycle management on closed-loop management of whole process, and taking the characteristics of asset management in power grid enterprises into consideration, this paper puts forward a MIMS diagnosis model of asset management process based on the concept of life cycle management. Using the MIMS model, this paper analyzes the problems of asset management of power grid enterprises from four dimensions, i.e., management mode, information sharing, decision making mechanism and methods, systems and standards. Finally, some suggestions on process rebuilding of asset life cycle management in power grid enterprises have been brought forward.
机译:根据资产生命周期管理对整个过程的闭环管理的需求,并考虑到电网企业资产管理的特点,本文提出了基于生命概念的资产管理过程MIMS诊断模型循环管理。本文使用MIMS模型,从四维,即管理模式,信息共享,决策机制和方法,系统和标准分析了电网企业资产管理问题。最后,提出了关于电网企业中资产生命周期管理的进程重建的一些建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号