首页> 外文会议>Arctic Technology Conference >Suggested methods to reduce crane operations downtime
【24h】

Suggested methods to reduce crane operations downtime

机译:建议减少起重机操作停机的方法

获取原文

摘要

The increase in offshore activity in harsh weather areas of the world presents a major challenge for those involved in the management and execution of lifting operations. This challenge becomes all the more important when personnel are being transferred by crane. This paper examines some of the new technologies and operational philosophies that promise to help operators meet these new challenges. This includes motion monitoring technology developed in Norway that provides accurate real-time data on vessel responses for mariners, and crane operators, allowing them to increase the safety and extend the limits of lifting operations. Crane operational downtime has a major financial impact on arctic projects. Therefore there is pressure to maintain continuity of lifting operations. This proven technology – the Deck Motion Monitor (DMM) and the Arctic personnel carrier-allows the safe transfer of cargo and personnel for a higher percentage of time and reduces the time spent waiting for an optimal weather window
机译:世界苛刻的天气地区的海上活动的增加对参与管理和执行升降行动的人提供了重大挑战。当人员被起重机转移时,这一挑战变得更重要。本文审查了一些新技术和运营理念,以帮助运营商满足这些新挑战。这包括挪威开发的运动监控技术,可提供关于海底船舶和起重机运营商的船舶响应的准确实时数据,使它们能够提高安全性并延长提升操作的限制。起重机运营停机时间对北极项目产生重大财务影响。因此,存在压力来保持提升操作的连续性。这项经过验证的技术 - 甲板运动监视器(DMM)和北极人员承运人 - 允许货物和人员的安全转移,以获得更高的时间,并减少等待最佳天气窗口的时间

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号