首页> 外文会议>Society of Petroleum Engineers/European Association of Geoscientists and Engineers European Unconventional Resources Conference and Exhibition >Improving Completion and Stimulation Effectiveness in Unconventional Reservoirs – Field Results in the Eagle Ford Shale of North America
【24h】

Improving Completion and Stimulation Effectiveness in Unconventional Reservoirs – Field Results in the Eagle Ford Shale of North America

机译:提高非传统水库的完成和刺激效果 - 北美鹰福特页岩的现场成果

获取原文

摘要

In an unconventional reservoir, the success of a project is driven by the completion. Unconventional plays have become the primary area of development in the US, and shale formations dominate the current rig activity. Most shale wells are drilled utilizing long horizontal wellbores, and completed using cemented or uncemented casing strings. To be economic, they require large hydraulic fracture treatments in multiple stages along the lateral. Total well costs are driven by the cost of fracturing, often representing as much as 60% of the total well cost. This requires the operator to select the best completion method which includes casing and wellhead selection that is based on stimulation needs. The stimulation is regulated by injection rates, treating pressures, the volume of the stimulation, type of fluid, proppant selection, perforations, and the number of stages. This paper focuses on several areas that are critical in a successful completion such as: casing size and pressure rating, wellhead selection, treatment design, spacing of the perforations and stages, linear verses cross-linked fluid, and the impact of proppant selection. With over 1800 wells completed and stimulated so far, a comparison of successful treatments and the cause of unsuccessful treatments will be provided. A review of actual field applications will be presented where possible, and a method for identifying best completion practices will be discussed. Those working in or considering developments in unconventional plays around the world will be able to compare their current completion techniques to those presented in the paper. In addition, while no two resource plays are the same, the findings in this paper can be used by engineers as a guide for moving up the learning curve more quickly in other unconventional plays.
机译:在一个非常规储层中,项目的成功由完成驱动。非常规的戏剧已成为美国的主要发展领域,页岩地层主导着当前的钻机活动。大多数页岩井利用长水平井筒钻,并完成使用粘合或未化的套管串。要经济,它们需要沿着横向的多个阶段的大型液压断裂处理。总井成本是由压裂成本驱动的,通常代表总井成本的60%。这要求操作员选择最佳完成方法,包括基于刺激需求的套管和井口选择。通过注射速率,治疗压力,刺激的体积,流体的体积,液,支撑剂选择,穿孔和阶段数量来调节刺激。本文重点介绍了在成功完成中至关重要的几个领域,例如:套管尺寸和压力等级,井口选择,处理设计,穿孔和阶段的间隔,线性谱系交联流体,以及支撑剂选择的影响。到目前为止,迄今为止,迄今为止已完成和刺激,将提供成功治疗和未成功治疗的原因的比较。在可能的情况下,将介绍对实际现场应用的审查,并讨论用于识别最佳完成实践的方法。在世界各地的非传统竞争中工作或考虑发展的人将能够将他们目前的完工技术与本文提出的那些进行比较。此外,虽然没有两个资源播放相同,但是本文的发现可以由工程师使用作为在其他非常规剧中快速地移动学习曲线的指南。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号