【24h】

Using Digital Oilfield Principles to Enhance Safety

机译:使用数字油田原理来增强安全性

获取原文

摘要

Chevron has applied digital oilfield principles to enhance workforce safety in emergency situations. An older emergency management process was transformed into a centrally coordinated workflow to guide decisive action and timely evacuation during tropical cyclones. The Chevron operated Gorgon Project will develop the Gorgon and Jansz-Io gas fields, located within the Greater Gorgon area, about 130 kilometres off the north-west coast of Western Australia. The Project is being constructed on Barrow Island, a Class A Nature Reserve located approximately 60 km off the north west coast of Australia. The environment on Barrow Island is unique. It is home to flora and fauna, some of which are not found anywhere else in the world. Chevron has operated Australia's largest onshore oilfield on the island for more than 40 years, demonstrating that industry and the environment can successfully coexist. The Gorgon Project is driving significant activity on and around Barrow Island. The construction phase workforce has expanded to undertake offshore drilling and marine operations, plant site preparation, accommodation facilities and aviation support as well as continuing oilfield operations. The northern coast of Australia, including Barrow Island, is prone to severe tropical storms each season, from November through April. The safety threat is real and unpredictable. Growth in Chevron's workforce drove a requirement for a well-coordinated storm evacuation process, with unified accountability across the island and offshore vessels. This need was met by developing an i-field decision environment that unites all affected groups, tracks all personnel, coordinates critical data like storm projections and aircraft availability and conserves the safety margin through data-guided decisions, as a cyclone develops and moves. This transformed evacuation process informs the decisive action that is needed, balancing the paramount need for safety with environmental responsibility and operational goals. This paper describes the results of improved efficiency in demanning safely during storm threats and remanning quickly once the storm threat passes.
机译:雪佛龙已应用数字油田原则,以提高紧急情况下的劳动力安全。较旧的紧急管理过程被转变为集中协调的工作流程,以指导热带气旋中的决定性行动和及时疏散。雪佛龙经营的Gorgon项目将开发位于距离西澳大利亚西北海岸大海岸约130公里的Gorgon和Jansz-IO天然气领域。该项目正在Barrow Island建造,一流的自然保护区距离澳大利亚西北海岸约60公里。巴罗岛的环境是独一无二的。它是植物群和动物群的所在地,其中一些没有在世界上的其他任何地方找到。雪佛龙在岛上经营了澳大利亚最大的陆上油田,超过40年,展示了该行业和环境可以成功共存。 Gorgon项目在Barrow Island上行驶了重要的活动。施工阶段劳动力扩大,承接海上钻井和海洋业务,工厂现场准备,住宿设施和航空支持以及持续的油田运营。 11月至4月,澳大利亚北部海岸(包括Barrow Island)易于每季严重热带风暴。安全威胁是真实的和不可预测的。雪佛龙劳动力的增长推动了一个协调良好的风暴疏散过程的要求,潜在岛屿和海上船只的统一问责制。这种需求通过开发I-Field决策环境来核准所有受影响的团体,跟踪所有人员,坐标,如风暴预测和飞机可用性等关键数据,并通过数据引导决策保存安全保证金,因为飓风发展和移动。这种转变的疏散过程会通知所需的果断行动,平衡愿人的需求与环境责任和运营目标的安全。本文介绍了在暴风雨威胁期间安全地在风暴威胁和迅速再次进入的效率提高的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号