首页> 外文会议>POWER-GEN Europe Conference and Exhibition >Reduction of energy and water consumption in EL-TO power plant
【24h】

Reduction of energy and water consumption in EL-TO power plant

机译:el-to发电厂中的能量和耗水量减少

获取原文

摘要

EL-TO Zagreb cogeneration power plant exist on its location since 1907. It has been developed through years in different phases. Presently it has two cogeneration units, which consist of steam turbines and high pressure boilers. Unit A has 12 MWe and unit B has 30 MWe. There are also two gas turbines (2 x 25 MWe) connected to two HRSGs that produce 120 t/h of low pressure steam and 20MWt of hot water. Two hot water boilers (2 x 116 MWt) are used for district heating of town Zagreb and one low pressure steam boiler (80 t/h, 17 bar) is used for producing industrial steam for neighbouring industry.
机译:自1907年以来,EL-to Zagreb热电厂存在于其位置。它已经通过不同阶段的多年来发展。目前,它具有两个热电联产单元,由蒸汽轮机和高压锅炉组成。单位A有12 MWE,U单位B有30米。还有两个燃气轮机(2×25mWE)连接到两个HRSG,产生120吨/小时的低压蒸汽和20mWt的热水。两个热水锅炉(2 x 116 mwt)用于Zagreb镇的区供暖,一个低压蒸汽锅炉(80吨/小时,17巴)用于为邻近行业生产工业蒸汽。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号