Prospects and problems of increasing electricity production from mid-size renewable energy generation on the South-West Interconnected System (SWIS) in WA

机译:沃斯西南互联系统(SWIS)中大小可再生能源发电增加的前景及问题

获取原文

摘要

Western Australia (WA) is truly blessed by abundant and readily available renewable energy resources. Yet most of its energy use still comes from fossil fuel energy. In the case of the South-West Interconnected System (SWIS), which is the largest grid of the state, renewable energy represented only 4 percent of the total electricity production in 2009-2010. From these two facts, this paper looked at the possible causes of such a small production of renewable energy and the future development of renewable energy technology for the SWIS in the coming decades. It was noticed that the SWIS and its economic and political structure tend to create barriers to renewable energy through strict market rules and lack of political will. This is particularly true for mid-size renewable energy (RE) facilities of less than 30MW, which cannot compete with traditional electricity production and are faced with technical issues to be integrated in the energy mix. In addition, strong lobby groups, encouraged by abundant fossil fuel reserves in WA, deepen the obstacles preventing fast development of renewable energy for the SWIS. There are many opinions and studies of various academic and industry experts that claim it is technically and practically possible to produce 100% of electricity from RE by 2050 in some parts of the world, which is also valid for the SWIS. However, with the current barriers and policies in place, it is very unlikely that the SWIS would achieve such an outcome. This paper discusses the barriers and driving factors of the RE sector and the possibility to improve RE production for the SWIS. It also discusses the role of the government in the energy market to increase RE penetration in the SWIS.
机译:西澳大利亚州(WA)真正拥有丰富,易于可再生能源资源。然而,其大部分能源使用仍然来自化石燃料能源。在西南互联系统(SWIS)的情况下,这是国家最大的电网,可再生能源仅占2009 - 2010年总电力生产的4%。从这两个事实来看,本文介绍了在未来几十年中为SWIS提供了这种小型可再生能源和未来发展的未来发展的可能原因。人们注意到,通过严格的市场规则和缺乏政治意愿,SWIS及其经济和政治结构倾向于为可再生能源创造障碍。对于小于30MW的中型可再生能源(RE)设施尤其如此,这不能与传统的电力生产竞争,并面临在能量混合中集成的技术问题。此外,强大的大堂集团鼓励WA的丰富化石燃料储量加深了阻碍了SWIS的可再生能源快速发展的障碍。各种学术和行业专家有许多意见和研究,这些专家声称在技术上,实际上可以在世界某些地区在2050年在世界某些地区产生100%的电力,这对SWIS也有效。然而,随着当前的障碍和政策到位,SWIS非常不太可能会达到这样的结果。本文讨论了重新部门的障碍和驱动因素以及改善SWIS的重新生产的可能性。它还讨论了政府在能源市场中的作用,以提高SWIS中的重新渗透。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号