The Town of Gilbert, AZ, needed to meet the potable water demands of their existing and future customers. One water resource strategy was to utilize their Colorado River water allocation and build a new water treatment plant (WTP). This entailed constructing a 13-1/2 mile, 48-inch diameter pipeline to convey raw water from the Central Arizona Project (CAP) Canal to the San Tan Vista WTP. Gilbert's major challenges included: 1. Complete the project within 30 months to allow the WTP to be commissioned prior to the 2009 warm weather, high water use season. 2. Only one mile of the pipeline could be routed within Gilbert's boundaries; the remainder required use permits, right-of-way (ROW), or easements from over 200 public agencies and private landowners in adjacent communities. 3. Meet the budget agreed to by Gilbert and the City of Chandler, an equal partner in the project.
机译:AZ吉尔伯特镇需要满足其现有和未来客户的饮用水需求。一个水资源战略是利用他们的科罗拉多河水分配并建造新的水处理厂(WTP)。这需要构建13-1 / 2英里,直径48英寸的管道,从中央亚利桑那州项目(盖子)运河到San Tan Vista WTP。吉尔伯特的主要挑战包括:1。在30个月内完成项目,以便在2009年温暖的天气,高水位季节之前委托WTP。 2.只有一英里的管道可以在吉尔伯特的界限内进行路由;剩余的必需使用许可证,右路(行)或200多个公共机构和邻近社区的私人土地所有者的地区。 3.符合吉尔伯特和钱德勒市同意的预算,该项目的平等合作伙伴。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号